ECM - Phase Inverter II
Analyzes incoming targeting signals and attempts to counter them by emitting an out-of-phase signal back. Great against Ladar targeting systems.
Public: yes
Volume: 5 m3
Meta Level: 5
Tech Level: 2
Fitting Powergrid Usage: 1 MW
CPU Usage: 48 tf
Structure Structure Hitpoints: 40 HP
Capacitor Activation Cost: 57 GJ
Targeting Optimal Range: 32 km, 76 m
Miscellaneous Activation Time / Duration: 20 sec
Accuracy Falloff: 35 km, 640 m
Gravimetric Strength: 1.2
LADAR Strength: 3.6
Magnetometric Strength: 1.2
RADAR Strength: 1.2
Heat Damage: 6.6 HP
Required Thermodynamics Level: 1 Level
Overload ECM Bonus: 20%
Other Ew Target Jam: 0
Heat Dissipation Rate Modifier: 0.02
Blueprint
Public: yes
Volume: 0.01 m3
Tech Level: 2
Wastage Factor: 10%
Max Runs Per Blueprint Copy: 100
Manufacturing Time: 2 hr, 13 min, 20 sec
Research Material Time: 6 hr, 40 min
Research Copy Time: 9 days, 6 hr, 13 min, 20 sec
Research Productivity Time: 6 hr, 40 min
Research Invention Time: 1 day, 9 hr, 20 min
Productivity Modifier: 1,600
Material Modifier: 5
|
|
|