eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 

ECM - Phase Inverter test

Analyzes incoming targeting signals and attempts to counter them by emitting an out-of-phase signal back. Great against Ladar targeting systems.

  • Public: no
  • Volume: 5 m3
  • Meta Level: 1
  • Tech Level: 1

Fitting

  • Powergrid Usage: 1 MW
  • CPU Usage: 40 tf

Structure

  • Structure Hitpoints: 40 HP

Capacitor

  • Activation Cost: 48 GJ

Targeting

  • Optimal Range: 26 km, 730 m

Miscellaneous

  • Activation Time / Duration: 30 sec
  • Accuracy Falloff: 29 km, 700 m
  • Gravimetric Strength: 1
  • LADAR Strength: 3
  • Magnetometric Strength: 1
  • RADAR Strength: 1
  • Reactivation Delay: 10 sec
  • Cannot Auto Repeat: True
  • Heat Damage: 10 HP
  • Required Thermodynamics Level: 1 Level
  • Overload ECM Bonus: 20%

Other

  • Ew Target Jam: 0
  • Heat Dissipation Rate Modifier: 0.01