eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 
eveiverse.com portal for the EVE universe 

Modulated Strip Miner II

The Modulated Strip Miner II uses many of the same frequency modulation crystal technology as the Modulated Deep Core Miner II except it lacks the deep core mining capacity of its smaller sibling.

Can only be fit to Mining Barges and Exhumers.

Uses mining crystals.

Cannot fit a mercoxit mining crystal.

  • Public: yes
  • Radius: 25 m
  • Volume: 5 m3
  • Capacity: 50 m3
  • Meta Level: 5
  • Tech Level: 2

Fitting

Structure

  • Structure Hitpoints: 40 HP

Capacitor

  • Activation Cost: 120 GJ

Targeting

  • Optimal Range: 15 km

Miscellaneous

  • Activation Time / Duration: 3 min
  • Mining Amount: 360 m3
  • Charge Size: Small
  • Used With (Chargegroup): Charge / Mining Crystal
  • Specialty Crystal Mining Amount: 360 m3
  • Color Scheme: 11,347

Other

Blueprint

  • Public: yes
  • Volume: 0.01 m3
  • Tech Level: 2
  • Wastage Factor: 10%
  • Max Runs Per Blueprint Copy: 100
  • Manufacturing Time: 4 hr, 26 min, 40 sec
  • Research Material Time: 8 hr, 53 min, 20 sec
  • Research Copy Time: 18 days, 12 hr, 26 min, 40 sec
  • Research Productivity Time: 13 hr, 20 min
  • Research Invention Time: 2 days, 18 hr, 40 min
  • Productivity Modifier: 3,200
  • Material Modifier: 5